---
title: "December campus maintenance"
type: "article"
space: "MyNews"
author: "Stephanie Conte"
created: 2022-12-13T16:49:32Z
updated: 2022-12-16T16:05:54Z
tags: ["student-news"]
url: "https://students.senecapolytechnic.ca/spaces/112/mynews/articles/student-news/8384/december-campus-maintenance"
---

# December campus maintenance

There will be various maintenance shutdowns taking place throughout December.

**King Campus**

Water distribution system maintenance will take place on Saturday, Dec. 17 from noon to 6 p.m. Water will be shutoff during this time, but portable washrooms will be available outside Garriock Hall, King Campus Residence and the Animal Health Centre.

A power shut down will take place on Friday, Dec. 23 from 7:30 a.m. to 3 p.m. All buildings will be impacted except for Magna Hall.

**Markham Campus**

A power shut down will take place on Wednesday, Dec. 28 from 8 a.m. to 3 p.m.

**Seneca@York Campus**

A power shut down will take place on Thursday, Dec. 29 from 8 a.m. to 3 p.m.
