Loading ...

Newnham Campus power shutdown — April 28 to April 29 | MyNews | Seneca Students

Home » Spaces » MyNews » Articles » Newnham Campus power shutdown — April 28 to April 29
MyNews

Leave Space :

Are you sure you want to leave this space?

Join this space:

Join this space?

Edit navigation item

Required The name that will appear in the space navigation.
Required
Required
Required The url can point to an internal or external web page.
 
Login to follow, share, and participate in this space.
Not a member?Join now
Newnham Campus power shutdown — April 28 to April 29

Newnham Campus power shutdown — April 28 to April 29

 /5
0 (0votes)

Power will be shut off at Newnham Campus from 9:30 p.m. on Friday, April 28 until 6:30 a.m. on Saturday, April 29.

The shutdown will impact Buildings A and A+ along with the Maintenance Shop.

Comments (no comments yet)