Loading ...

Power outage planned for King Campus | MyNews | Seneca Students

Home » Spaces » MyNews » Articles » Power outage planned for King Campus
MyNews

Leave Space :

Are you sure you want to leave this space?

Join this space:

Join this space?

Edit navigation item

Required The name that will appear in the space navigation.
Required
Required
Required The url can point to an internal or external web page.
 
Login to follow, share, and participate in this space.
Not a member?Join now
Version 1
Power outage planned for King Campus

Power outage planned for King Campus

 /5
0 (0votes)

There will be a power outage at most of King Campus on Saturday, Feb. 22.  

The power will be turned off at 7 a.m. in most buildings due to Hydro One work. It is expected to be restored at or before 10 a.m. 

While the work is being done, there will be emergency lighting in the residence and Garriock Hall and the vet-tech building will be on generator power. 

The following buildings will not be affected by the shutdown: Magna Hall, the Gate House, Eaton Hall, the water and sewage plants.  

Seneca apologizes for any inconvenience this may cause. 

Comments (no comments yet)