Loading ...

Lighting upgrades at Stephen E. Quinlan Building, Seneca@York Campus | MyNews | Seneca Students

Home » Spaces » MyNews » Articles » Lighting upgrades at Stephen E. Quinlan Building, Seneca@York Campus
MyNews

Leave Space :

Are you sure you want to leave this space?

Join this space:

Join this space?

Edit navigation item

Required The name that will appear in the space navigation.
Required
Required
Required The url can point to an internal or external web page.
 
Login to follow, share, and participate in this space.
Not a member?Join now
Version 1
Lighting upgrades at Stephen E. Quinlan Building, Seneca@York Campus

Lighting upgrades at Stephen E. Quinlan Building, Seneca@York Campus

 /5
0 (0votes)

The lighting will be changed from flourescent to LED bulbs on the third floor of the Stephen E. Quinlan Building on the Seneca@York Campus. 

The work will begin Monday, Feb. 24 and is expected to be completed by Friday, March 14. It will be done daily between 10 p.m. and 7 a.m. 

Comments (no comments yet)