Loading ...

Waterproofing repairs for buildings B and D at Newnham Campus to start July 26 | MyNews | Seneca Students

Home » Spaces » MyNews » Articles » Waterproofing repairs for buildings B and D at Newnham Campus to start July 26
MyNews

Leave Space :

Are you sure you want to leave this space?

Join this space:

Join this space?

Edit navigation item

Required The name that will appear in the space navigation.
Required
Required
Required The url can point to an internal or external web page.
 
Login to follow, share, and participate in this space.
Not a member?Join now
Version 1
Waterproofing repairs for buildings B and D at Newnham Campus to start July 26

Waterproofing repairs for buildings B and D at Newnham Campus to start July 26

 /5
0 (0votes)

Please be advised that waterproofing and foundation repairs for sections of buildings B and D at Newnham Campus will start simultaneously on Saturday, July 26, followed by concrete repairs for the loading dock that’s located near the exterior entrance to Building D. The repairs are expected to be completed by Sunday, Aug. 31.

Expected impact on you

As removals and excavations will be part of the waterproofing and foundation repairs, you can expect fencing and signage to be placed around the impacted areas for your safety.

You can also expect:

  • Having regular access to all entrances, doors and emergency exits/push buttons
  • Temporary relocation of our beloved hot dog stand
  • Having limited access to the loading dock area during the concrete repairs

For your convenience, we have included a campus map that highlights the impacted areas in two red circles, with the temporary location of the hot dog stand represented by a red star:

Newnham Campus map in black and grey, with select areas in buildings B and D circled in red to reflect the scheduled repairs, and a red star that represents the temporary location of the campus hot dog stand

 

Thank you for your patience and understanding.

Comments (no comments yet)