Loading ...

Newnham Campus power shutdown — March 3 and 4 | MyNews | Seneca Students

Home » Spaces » MyNews » Articles » Newnham Campus power shutdown — March 3 and 4
MyNews

Leave Space :

Are you sure you want to leave this space?

Join this space:

Join this space?

Edit navigation item

Required The name that will appear in the space navigation.
Required
Required
Required The url can point to an internal or external web page.
 
Login to follow, share, and participate in this space.
Not a member?Join now
Newnham Campus power shutdown — March 3 and 4

Newnham Campus power shutdown — March 3 and 4

 /5
0 (0votes)

Power will be shut off in Building A, A+ and the Maintenance Shop at Newnham Campus from 10:30 p.m. on Friday, March 3 to 6:30 a.m. on Saturday, March 4 due to electrical maintenance.

Comments (no comments yet)